GT5-Unofficial/main/java/gregtech/common/tileentities/machines/multi
pyure a170c6529a Update Large Steam Turbine
* Multiple input hatches now handled properly.
* Now use 125% maximum input consumption and penalty
* We now track averageFlow and totalFlow separately: we don't want turbine byproducts generated from the average, but the actual consumption.


Notes from last pull:
* We track 125% allowance via remainingFlow.  We do still attempt to pull 125% from each hatch, but only up to our 125% overall allowance. (So even with two hatches, we can still only pull 500 steam total from a 400 steam rotor)
* With remainingFlow, we gain optimization: we don't even check unnecessary hatches if the first one provided enough steam.
* Reinstated averageFlow.
* added a ton of comments for your convenience.
2015-08-08 20:14:06 -04:00
..
GT_MetaTileEntity_BronzeBlastFurnace.java
GT_MetaTileEntity_DistillationTower.java Update 5.08.26 2015-08-02 13:00:23 +02:00
GT_MetaTileEntity_ElectricBlastFurnace.java
GT_MetaTileEntity_FusionComputer.java
GT_MetaTileEntity_FusionComputer1.java
GT_MetaTileEntity_FusionComputer2.java
GT_MetaTileEntity_FusionComputer3.java
GT_MetaTileEntity_HeatExchanger.java Update 5.08.26 2015-08-02 13:00:23 +02:00
GT_MetaTileEntity_ImplosionCompressor.java
GT_MetaTileEntity_LargeBoiler.java
GT_MetaTileEntity_LargeBoiler_Bronze.java
GT_MetaTileEntity_LargeBoiler_Steel.java
GT_MetaTileEntity_LargeBoiler_Titanium.java
GT_MetaTileEntity_LargeBoiler_TungstenSteel.java
GT_MetaTileEntity_LargeTurbine.java Update 5.08.26 2015-08-02 13:00:23 +02:00
GT_MetaTileEntity_LargeTurbine_Gas.java Update 5.08.26 2015-08-02 13:00:23 +02:00
GT_MetaTileEntity_LargeTurbine_HPSteam.java Update 5.08.26 2015-08-02 13:00:23 +02:00
GT_MetaTileEntity_LargeTurbine_Plasma.java Update 5.08.26 2015-08-02 13:00:23 +02:00
GT_MetaTileEntity_LargeTurbine_Steam.java Update Large Steam Turbine 2015-08-08 20:14:06 -04:00
GT_MetaTileEntity_MultiFurnace.java
GT_MetaTileEntity_ProcessingArray.java
GT_MetaTileEntity_VacuumFreezer.java